After finally selling the 200G and the 240 G on the same day, the 270G has been slowly coming to life .
First there was the washing and scrubbing..
[/img]
Then the scraping..sanding and polishing...
And the painting....
The preparation of the room..(retiling after the flood)
positioning the Tank
Finishing the plumbing for the Close loop.
And then water was added and guess what...