Update:Plumbing
So I got my Tank Drilled, and installed some Plumbing to the new Sump I purchased from Mark(clap).
First is the Plumbing, I installed a Valve inline after the Barb to regulate the flow. I will also have one inline onthe flex hose from the pump.
And a coupler at the top of the Sump so I can remove the sump if needed..
The other is the LR In a Sump Bin from Garrett(thanks Garrett) I have about 10Lbs of Live sand and about 30lb of LR and 30lb of rock I am seeding. This has been up and running for about 3 weeks.. My Light Canopy is about 50% done as well...(clap).
I'll Post Pics of Canopy when finished..