Ok sorry I have lots going on in my brain.
Task 1: AWC using DOS to sump from 65gallon salt reservoir. This concept I understand. Just curious of scheduling alongside with ATO.
Task 2: Auto top off using DOS with or without existing apex ato. Does water tubing connect to ato near float valve or just drop into sump? This is for replacing evaporated water using 65gallon r/o reservoir.
I have 3 DOS machine total. I understand one FULL DOS is for AWC, then one head on another machine for ATO. That leaves me 3 DOS heads for other stuff.
Both 65 gallon reservoir are located 60 feet away. No issues with DOS’s pulling that far.